A mid-size functional-beverage manufacturer came to us with a familiar problem: three citrus-forward SKUs on the roadmap, a locked launch window, and no data to decide which one to lead with. The plan was to produce all three and let retail sort it out — an expensive way to run an experiment.

Instead, they ran a single 45-day HexaFlo pilot in two real locations before committing a single production run.